Case Studies
-
Long Term Flow Monitoring Study, Delaware County PA
CSL was subsequently selected to install, operate and maintain, collect data, provide meter calibration services, and monthly reporting services for approximately 150 sewer flow meters in the Eastern Delaware County service area of DELCORA.
More >> -
Long Term Flow Monitoring, Bucks County PA
CSL has been responsible for operating and maintaining 120 permanently installed flow meters in the BCWSA system since 2003.
More >> -
DC Water Clean Rivers- Combined Sewer Overflow (CSO) Study, Washington DC
CSL was selected to conduct a Combined Sewer Overflow (CSO) Study involving 70 temporary flow meters for a period of six months.
More >> -
Temporary and Long-Term Flow Monitoring, Philadelphia PA
CSL has been performing flow metering services in the PWD system since 2003.
More >> -
Combined Sewer Overflow (CSO) Monitoring, New Haven, CT
This complex project requires metering over 40 locations simultaneously in the combined sewer outfall (CSO) pipes and regulator structures for the Greater New Haven Water Pollution Control Authority (GNHWPCA). Based
More >> -
Hampton Roads Sanitation District (HRSD) Temporary and Long-term Flow Monitoring
HRSD currently provides wastewater treatment services for 17 counties and cities with a population of about 1.6 million. CSL was selected to install, operate and maintain, collect data, provide meter
More >> -
Sanitation Districts of Los Angeles County (LACSD) Long-term Flow Monitoring Study
CSL installed thirteen flow meters in May of 2012, and has been operating and maintaining these meters since. Since the beginning of the project, the uptime has been greater than
More >> -
City of Jackson, MS Long-term Flow Monitoring
CSL was selected to install 29 long term flow meters and 4 rain gauges along the West Bank Interceptor. These meters serve as the baseline to provide information for the
More >>